Week 34 (FYP 2): Submit full report FYP

›
OBJECTIVES: 1. To finalize the full report (Chapter 1-5) before submitted to supervisor and library UniKL BMI.             2. To submit t...
Monday, 5 November 2018

Week 33 (FYP 2): Chapter 5 (Conclusion and Recommendation)

›
OBJECTIVES: 1. To make a conclusion for this project.            2. To find a few recommendations  to improve my project  in future . ...
1 comment:
Monday, 29 October 2018

Week 32 (FYP 2): Chapter 4 (Result and Discussion)

›
OBJECTIVES: 1. To show the result for this project.             2. To describe in detail the process of this system.             3. To exp...
Monday, 22 October 2018

Week 31 (FYP 2): Presentation Day

›
OBJECTIVES: 1. To present the poster and hardware(project) to my assessors.            2. To know the comment and feedback about my proj...
Monday, 15 October 2018

Week 30 (FYP 2): Preparation for Industrial Day

›
OBJECTIVES: 1. To do a poster for presentation in A1 size.            2. To have an approval from supervisor for the poster. METHODOL...
Tuesday, 9 October 2018

Week 29 (FYP 2): Design the model for the project

›
OBJECTIVES: 1. To design the project on the wooden planks.             2. Decorate the place to put the plants. METHODOLOGY: 1. Prepare t...
Monday, 8 October 2018

Week 28: Set up the Hardware

›
OBJECTIVES: 1. To set up the hardware for my project.             2. To solder the component on a strip board. METHODOLOGY: 1. Connect th...